How is the project assessed?
A factory with mixed PLCs and software cannot use one connection method everywhere. Inventory hardware models, software versions, access rights and available protocols first. The existing OT network sets practical boundaries.
Define signals, sampling intervals, data types and time stamps together. Clarify which system owns each record and which interfaces permit writing. Reporting data paths should not be confused with automatic control.
Test network interruption, access control and reconnection before commissioning. There is no universal compatibility list; supported PLC, ERP and MES connections are documented in the project offer after review.
Example system flow
- 01Machine / PLC
- 02Data interface
- 03Validation
- 04MES / reporting
Information for technical review
- PLC and software models and versions
- OT network and access rights
- Signal list and sample record
Capacity, timing, compatibility and price are defined in the technical offer after samples, site data and scope are reviewed. This page does not make unverified performance or certification claims.
Related solutions
Questions before a project
Will it work with our existing system?
The team reviews machines, PLCs, software and interfaces. Compatibility, connection responsibility and additional hardware are defined in the technical offer; universal compatibility is not assumed.
Can we start with a pilot or trial?
Start with a limited task and acceptance criteria. Samples or site data define the trial, measures and next decision. Pilot availability and terms are agreed for the specific project.
Does installation stop production?
Connections and safety requirements may need a planned stop or test window. Agree the schedule with production and maintenance teams; zero downtime is not guaranteed.
How are capacity and price determined?
Product or load samples, target flow, conditions and integration scope are reviewed. The final configuration and commercial offer are based on these inputs.
How are data and software interfaces planned?
Define data sources, interfaces, permissions, retention and recovery responsibilities. On-site or cloud deployment is assessed against the customer environment.
What is the service and maintenance scope?
Discuss maintenance access, training, spares and remote support in the offer. Coordination with STU Servis is available through the group; warranty and response commitments require a written scope.